>>First step is to move the "monkey hut" (garage-y thing made from plastic conduit and a tarp) forward about 10 feet to make room for the tub, then some gravelling and levelling, then about 10 hours of tappity-tap with a rubber mallet putting all the pieces together. What could go wrong ?

OK, the first thing that went wrong is that it's rained pretty much non-stop since I picked up the kit, at least during the times when I've been home and able to work on it.

I'm about to move the monkey hut back to its original position so that I can assemble the tub under cover out of the rain. Sigh...

Last edited by bridgman; 08/12/12 07:21 PM.

M60ti, VP180, QS8, M2ti, EP500, PC-Plus 20-39
M5HP, M40ti, Sierra-1
LFR1100 active, ADA1500-4 and -8