Carpet picked and ordered. Install booked for 3 weeks from now. We went with a patterned light beige carpet. Should be really nice looking once the room is a put together. Chugging along. Today we got the windows in the theater boxed and trimmed. The electrical devices are 90% installed (waiting on sconce delivery) The ceiling lights are really spectacular. It is definitely worth the extra money and time to plan out lighting properly. Thanks goes out to Nick and Chess for their input. I still have to do caulking and paint touch ups.

I have to track down the cabinet hardware to install hinged doors on the electrical panel and also on the water main\meter in the other side of the basement. Once the doors are installed on those and painted up all that remains is the stair makeover. As soon as the room is carpeted the gear is getting brought back down to the basement and HT cabling will be pulled and readied.

Overhead Lights (without glass shades until finished making mess)


Rear Media\Diffuser wall spotlights (better impression of the wall color)