Re: Basement HT - Progress Report and Pictures
#114048 10/26/05 07:05 PM
Joined: Jul 2004
Posts: 828
aficionado
Offline
aficionado
Joined: Jul 2004
Posts: 828
i could be misunderstanding but wouldn't that cause you heat problems?


------------------------------------------------
Leave the gun, Take the canolis.
Re: Basement HT - Progress Report and Pictures
#114049 10/26/05 07:15 PM
Joined: Jul 2005
Posts: 353
devotee
Offline
devotee
Joined: Jul 2005
Posts: 353
In reply to:

After the resilient channel and drywall ceiling, it's 8'2". My finished height will be 8'1" once I lay the delta-fl subfloor, and laminate. I considered carpet for the added warmth, but I'm always hesitant to lay carpet in a basement.




Of course I am jealous. I am in a house built in 1952 with 81" from unfinished floor to underside of joist.

With Delta-FL you should have no problems with carpeting in the basement. As long as the basement floor slab was built with the proper drainage and your walls are properly moisture-proofed, you should have no problems with mold. That is the whole purpose of Delta-Fl to provide enough space to allow any moisture build-up [typical of that wicked up by concrete] to evaporate.

Re: Basement HT - Progress Report and Pictures
#114050 10/26/05 10:26 PM
Joined: Jan 2004
Posts: 96
old hand
OP Offline
old hand
Joined: Jan 2004
Posts: 96
The fireplace surround/cabinet work took a little longer than expected. It's almost done. I'm going to have the drywallers line the inside with 5/8" plywood, which will give me a solid foundation for my shelves.

This is the back, obviously, looking from the pool table area. I considered making it accessible from the back to ease wiring, but in the end decided to simply leave myself extra slack in the wires. The cabinet is also plenty wide, so I'll easily be able to turn the components to access wiring.


This is the front of the cabinet. The plan is to install 3 adjustable shelves.


Overall I'm happy with the design. Looking at it now, it might have been better to have a thicker top piece above the fireplace, but we decided on 3 1/2" to match the bottom.

Re: Basement HT - Progress Report and Pictures
#114051 10/26/05 10:37 PM
Joined: Apr 2003
Posts: 16,441
shareholder in the making
Offline
shareholder in the making
Joined: Apr 2003
Posts: 16,441
That looks awesome and is a great use of space. I'm a big fan of built-in storage.

Re: Basement HT - Progress Report and Pictures
#114052 10/26/05 10:44 PM
Joined: Jan 2004
Posts: 96
old hand
OP Offline
old hand
Joined: Jan 2004
Posts: 96
Regarding the heat issue, the unit I purchased is a direct vent, zero clearance. This means combustibles can be placed directly on the top and back of the fireplace, since it’s designed to radiate heat only from the 3 viewing glass areas. The top and back are only warm to the touch when operating the fireplace. The inside of the cabinet will be ~ 4" away from the back of the FP, and I'll insulate this cavity to minimize any heat. I hope it works out; otherwise I’ve just designed a very expensive non-functional room divider! (I say this because if it comes down to using the HT equipment or the FP… the HT wins out!)

Re: Basement HT - Progress Report and Pictures
#114053 10/26/05 10:57 PM
Joined: Jan 2004
Posts: 96
old hand
OP Offline
old hand
Joined: Jan 2004
Posts: 96
I was very clear to the builder that I wanted a minimum of 8’ finished height after ceiling and subfloor.

As far as carpet goes, you make some valid arguments, and I am thinking about it. I installed r-foil under the slab, which the manufacturer claims an r10 equivalent insulation factor and should take care of any moisture problems. I also ran an extra perforated weeping tile circuit throughout the interior perimeter, in addition to the standard exterior perimeter.


Here’s the r-foil before the floor was poured.



Re: Basement HT - Progress Report and Pictures
#114054 10/26/05 11:02 PM
Joined: Jan 2004
Posts: 96
old hand
OP Offline
old hand
Joined: Jan 2004
Posts: 96
Thanks Peter, I also like the clean look of built-ins. Our original layout had the HT area where the Play area ended up, since I could incorporate a built-in component rack under the entrance stairs. I was disappointed when that layout was cancelled due to other factors. I'm glad the peninsula fireplace with component rack worked out.

Re: Basement HT - Progress Report and Pictures
#114055 10/27/05 04:25 AM
Joined: Jul 2005
Posts: 353
devotee
Offline
devotee
Joined: Jul 2005
Posts: 353
In reply to:

I installed r-foil under the slab, which the manufacturer claims an r10 equivalent insulation factor and should take care of any moisture problems. I also ran an extra perforated weeping tile circuit throughout the interior perimeter, in addition to the standard exterior perimeter.




Most excellent. This should almost be standard construction practice. One of my biggest "pet-peaves" is the building codes' minimum requirements. This is of course what all contractors build to unless you spend some time researching and request the better install or have good knowledgable contractors who are willing to educate the client.

Looks like you did your research and I think it will definnitely pay off with a very comfortable basement!

Re: Basement HT - Progress Report and Pictures
#114056 10/27/05 05:21 PM
Joined: Jan 2004
Posts: 96
old hand
OP Offline
old hand
Joined: Jan 2004
Posts: 96
My builder was no different than most, and would have built to minimum code requirements. As you say, it took research on my part to figure out the best way to do things. Another 6 weeks and I'll be sitting in my 'comfortable' basement enjoying music and movies!

Re: Basement HT - Progress Report and Pictures
#114057 11/16/05 03:32 PM
Joined: Jan 2004
Posts: 96
old hand
OP Offline
old hand
Joined: Jan 2004
Posts: 96
Another update:
The drywall and painting are complete, and I've installed the delta-fl subfloor. The pictures are a couple days old, I now have the laminate in the main room complete. The office and bathroom should be done tonight. I apologize in advance for the poor picture quality. My digital camera is acting up again.

Screen wall: I built a frame that is 8" wider and taller than my screen, and painted it flat black, with the goal of absorbing light for brighter perceived picture.


Front HT Area: This is a slightly different angle, showing the integrated component rack and fireplace.


Component rack / fireplace.


Left QS8 location: Note the box I installed that houses the speaker wire and will be covered by the left QS8.


I will be moving the furniture and equipment down this week. Unfortunately, I'm out of town this weekend, which means I will not be able to finish the set-up until next week. As for the remaining work, the floors will be done tonight, then I have to finish the wiring for networking, satellite, speakers etc. Baseboards, doors, trim and bathroom fixtures. The basement should be completed by mid-December. I'll change the battery in my camera and hope to post some better shots tonight.

Page 2 of 7 1 2 3 4 5 6 7

Moderated by  alan, Amie, Andrew, axiomadmin, Brent, Debbie, Ian, Jc 

Link Copied to Clipboard

Need Help Graphic

Forum Statistics
Forums16
Topics24,940
Posts442,457
Members15,616
Most Online2,082
Jan 22nd, 2020
Top Posters
Ken.C 18,044
pmbuko 16,441
SirQuack 13,840
CV 12,077
MarkSJohnson 11,458
Who's Online Now
0 members (), 402 guests, and 3 robots.
Key: Admin, Global Mod, Mod
Newsletter Signup
Powered by UBB.threads™ PHP Forum Software 7.7.4