Previous Gallery
Next Gallery
Print Thread
Rate Thread
Outriggers part 3
#356575 10/13/11 02:54 AM
3 Images
Joined: Jan 2007
Posts: 83
Z
zuter Offline OP
old hand
Outriggers part 3

Here's another couple variations:

1. I've added spikes top and bottom as a design element and a way to hide the attaching mechanism.
2. If you turn them over the shipped rubber feet can be used instead of the spikes (as per request).
3. Here the bars have been thickened for threading and attaching the spikes for a cleaner look (also requested).

I've found some metal for the bars which I'll use in a mock up. I'll do this myself to work out any kinks first. The spikes are another matter. I've checked online but the shipping is more than the cost of the spikes. I haven't heard what they'll cost to be made...I'll look into this after I get the bars done.

Please comment and thanks in advance!
1 Comments
Re: Outriggers part 3
zuter #356644 10/15/11 05:15 AM
Joined: Dec 2003
Posts: 10,420
J
shareholder in the making
Offline
shareholder in the making
J
Joined: Dec 2003
Posts: 10,420
Zuter, give me a call if you still have my number, send me a PM if not. I have spikes I am not using, providing I can locate them in the after math of the move, stil have stuff in boxes and will for quite some time.


Moderated by  alan, Andrew, Brent, Ian, Jc 

Link Copied to Clipboard

Need Help Graphic

Forum Statistics
Forums16
Topics24,940
Posts442,457
Members15,616
Most Online2,082
Jan 22nd, 2020
Top Posters
Ken.C 18,044
pmbuko 16,441
SirQuack 13,840
CV 12,077
MarkSJohnson 11,458
Who's Online Now
0 members (), 563 guests, and 1 robot.
Key: Admin, Global Mod, Mod
Newsletter Signup
Powered by UBB.threads™ PHP Forum Software 7.7.4