F107plus5, you're right, I certainly put a lot of thought into it. Although, I did A LOT of the homework in the past few weeks. My father is managing the house construction and, believe it or not, I almost forgot to do the wiring. He said to me, "Didn't you plan to do some wiring in here?" I just got so side-tracked. So, I did a little crunch-time speaker and layout planning, ordered the wire, wall plates, connectors, etc. and just got it in before they insulated. All of the drywall will be up before the end of today.

You do bring up an excellent point. I think I'll do exactly what you say and get one EP500 now, then decide down the road if another is needed. Also, I may be dreaming thinking I'll have a lot of opportunities to crank it up with a 3 month old (and very protective wife) in the house!

Thanks again.

-Tom