Auggh. I wouldn't use anchors on the ceiling, even really high quality anchors installed perfectly. If the joists aren't in the right place then run a nicely finished piece of wood between the joists and hang the QS8 from the wood.

>>or is drywall strong enough to take both the static and dynamic loads?

I should also offer the non-engineer's view (not mine, but I had to learn it over the years) -- if it takes more time to work out the loads than it does to patch the drywall, just hang 'em from the drywall and don't stand under them for a few days until you know if they're going to fall down ;\)

Last edited by bridgman; 12/27/07 01:57 AM.

M60ti, VP180, QS8, M2ti, EP500, PC-Plus 20-39
M5HP, M40ti, Sierra-1
LFR1100 active, ADA1500-4 and -8