BlueJeans Cable lead time?
|
Joined: Jan 2004
Posts: 13,840 Likes: 13
shareholder in the making
|
OP
shareholder in the making
Joined: Jan 2004
Posts: 13,840 Likes: 13 |
Today I ordered a 25ft Subwoofer cable from Bluejeans. For those that have ordered from them before, how long does it usually take to arrive?
I want to move my EP500 to a different corner in my HT room, and don't want to spend a fortune for Monster junk.
Last edited by sirquack; 03/15/06 04:55 AM.
M80s VP180 4xM22ow 4xM3ic EP600 2xEP350 AnthemAVM60 Outlaw7700 EmoA500 Epson5040UB FluanceRT85
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Dec 2005
Posts: 3,301
connoisseur
|
connoisseur
Joined: Dec 2005
Posts: 3,301 |
Blue Jeans is always pretty fast, with my experience they ship the next day, then it's just waiting for the priority mail 2 to 3 days.
A computer once beat me at chess, but it was no match for me at kick boxing.
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Jan 2006
Posts: 107
veteran
|
veteran
Joined: Jan 2006
Posts: 107 |
takes about 10-14 days for canadians.
denon 3805
waiting for: M60ti QS8 VP150 EP500
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Dec 2003
Posts: 6,331
axiomite
|
axiomite
Joined: Dec 2003
Posts: 6,331 |
I use blujeans subwoofer cables exclusively. Unfortunately, I don't remember how long it took them to arrive, which means they arrived in a reasonable amount of time. If there was much of a delay, I'd remember (I think )
Boy, that was a helpful post, wasn't it.
Jack
"People generally quarrel because they cannot argue." - G. K. Chesterton
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Apr 2005
Posts: 170
veteran
|
veteran
Joined: Apr 2005
Posts: 170 |
My last order took 2 business days to arrive. I would consider their shipping to be quite fast
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Jan 2004
Posts: 13,840 Likes: 13
shareholder in the making
|
OP
shareholder in the making
Joined: Jan 2004
Posts: 13,840 Likes: 13 |
Just got a confirmation that my cable actually shipped the same day I ordered it, so hope to have it by the end of this week, cool.....
M80s VP180 4xM22ow 4xM3ic EP600 2xEP350 AnthemAVM60 Outlaw7700 EmoA500 Epson5040UB FluanceRT85
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Jul 2005
Posts: 200
local
|
local
Joined: Jul 2005
Posts: 200 |
my last order was delivered in 3 days....pretty fast
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Oct 2005
Posts: 558
aficionado
|
aficionado
Joined: Oct 2005
Posts: 558 |
BJC is the Axiom Audio of online cable manufacturers.
"That's some catch, that Catch-22." "It's the best there is."
M22ti
VP150
EP350
QS8
M3Ti
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: Dec 2005
Posts: 1,467
connoisseur
|
connoisseur
Joined: Dec 2005
Posts: 1,467 |
They packed it real nice and it arrived in 3 days tops.
M22s|VP100|QS4s|HSU STF2
|
|
|
Re: BlueJeans Cable lead time?
|
Joined: May 2003
Posts: 1,501
connoisseur
|
connoisseur
Joined: May 2003
Posts: 1,501 |
They are in Washington State, I am in the Los Angeles area. Cables were sent via USPS and got to me within 3 business days every time I ordered from them.
|
|
|
Forums16
Topics24,945
Posts442,487
Members15,617
|
Most Online2,082 Jan 22nd, 2020
|
|
0 members (),
577
guests, and
5
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|