Well the floor tile project has been delayed beacaue of health issue, vacations, and the fact I will not work on it when its over 100 degrees outside.
Total area I'm doing is about 1,300 sq feet, so ya, its taken a while, but it will be done before summer, but the rack system was a must, before I finish the tile in that area and only break some more. lol