thanks for all the nice comments guys. This project was really my first attempt at any type of construction and I did the entire basement in one shot, not just this room. I did everything myself which is why it took so long. I need to get the pine frame done, I think that'll pull the room together a little more. I'll post updated pics here once I get everything stained and frame installed.

Thanks again!



On a side note: One thing I bugs me about this forum is that you can't go back and edit an old post after some time has passed. Any mod that is reading, can you change the subject line in my post to read Newf's not News?




2xAA
M80/VP150/VP160/QS8
4xM3/M22OW/M2OW/VP150OW/4xM3IC/4xM3OW
EP500/800/HSU VTF3/SVS PB2k/SB2k/SB-12