I'm putting up all the ceiling layers first (before the walls). With only a 1/4" between the top of the wall and the ceiling I think this is the best/only order I can do it in. So, today most of the ceiling OSB is up.
[Linked Image from i.postimg.cc]

Tomorrow we will start on the next 2 layers: floorMuffler and first layer of wall board. They will be installed as a unit. The floorMuffler has some adhesive on one side (covered by the white strip in the pic below). Since it is 4' wide I can just lay it over each 4'x12' wallboard panel and adhere it in place.
[Linked Image from i.postimg.cc]

BTW: Getting these large panels up is greatly simplified with the wallboard lift. It was well worth the $179 I paid Harbor Freight. A single person could hang all the board with this and with two it's a piece of cake. Actually I don't think I could have done the job without it. After I'm done I bet I'll have no trouble selling it on craigslist.
[Linked Image from i.postimg.cc]