Today was LFR1100 day at the factory. It has been a wicked amount of work for everyone at Axiom getting all the final details required for this production run in order. Pictured below are SBrown’s pair ready to go for testing. I will be testing these myself in the big anechoic chamber in the morning along with Dakkon’s pair.




Ian Colquhoun
President & Chief Engineer