Here in our place now. Stuff arrived safe and sound. The space will actally be a little smaller than originally thought, but still a healthy 14.5 x 22 x 8 estimated when complete. Have to alter drawings and consult with an engineer to remove a support post. Then relocate a heating oil tank to the garage. Work ahead just to get to the framing stages! The post on the partially demoed wall corner is the make or break. Fingers crossed. Oh well. So far: