I can see you've been a cedar-shake-scribing fool as well. So worth it. The filler piece that was the transition from the old clapboards (?) to stone is nowhere near as clean a look. And I don't think that losing some of the depth of the stone reveal is a loss in any way----certainly not in exhange for the shakes.

A cup hook (or a 2.5" finishing nail) and a second ladder would help with the chalk lines. Scaffolding and planks are for poosies. (I'm guilty of skywalking, too, but Mark is on point---way safer and more maneuverability.)

What's going to happen to them after the installation is finished? You've been doing great so far, so don't piss me off now.


Always call the place you live a house. When you're old, everyone else will call it a home.