Slit and Fold vapour barrier over top of wall at each joist and attach to foundation sill plate/joists with acoustic-sealant. Insulate entire area above wall to rim joist.
Sounds like I'm good to go.
Sorry i hadn't seen this earlier or i could have replied. This is pretty standard practice for running vapour barrier into the joist ends or at the ceiling, however most builders don't bother with the acoustiseal caulking. I however do and thankfully, (but with exception in our basement), the rest of our house was constructed in this method. I was pleasantly surprised to find the tarry black substance while drilling down from the attic into a wall stud below.
Last edited by chesseroo; 11/19/1405:08 PM.
"Those who preach the myths of audio are ignorant of truth."